Proudly Scottish — designed, built & crafted in Scotland Free quotes: 07397 055182  ·  hello@mpsinteriors.co.uk
SCOTTISH RENOVATION GUIDE · MPS INTERIORS LTD · UPDATED JULY 2026

How Much Do Renovations Cost in Scotland? 2026 Price Guide

Nobody puts real numbers on their website. Here are honest 2026 ranges for the most common Scottish home projects — and what moves the price.

Typical Scottish renovation costs (2026)

ProjectTypical costTime on site
Garage conversion£15,000–£30,0003–5 weeks
Single-storey extension£2,000–£3,000+ per m²8–14 weeks
Wall removal (open-plan)£3,000–£8,0003–7 days + finishing
Loft conversion£25,000–£55,000+6–12 weeks
Full home renovation£1,200–£2,000+ per m²2–4 months
Fitted wardrobes / alcove unitsfrom £2,500 per room1–3 days
Kitchen / bathroom refit£8,000–£25,0002–5 weeks

Indicative 2026 ranges for Scotland, materials and labour, excluding VAT where applicable. A free MPS home visit gives you a fixed written quote for your actual property.

What drives the price up or down

  • Property type & age — a solid-stone tenement and a modern timber-kit behave very differently. Older buildings hide surprises.
  • Structural work — steel beams, underpinning and foundation depth near trees or drains add cost fast.
  • Consents — building warrant fees scale with the value of the work; planning applications add time.
  • Specification — glazing, kitchens, flooring and joinery are where budgets swing most.
  • Access — tenement stairs, tight sites and parking all affect labour time.
🚨 Cost traps to avoid: quotes that don't mention the building warrant (someone's cutting corners), "cheap" insulation in stone walls (the damp bill arrives two winters later), and day-rate-only pricing with no written scope.

Frequently asked

Why is your quote higher than a one-man band?
Because it includes the warrant, structural design, insurance, a written guarantee and a completion certificate. The cheapest quote is rarely the cheapest job once problems and resale paperwork are counted.
Can I phase the work to spread the cost?
Often yes — we can sequence a renovation so it's paid and built in stages. We'll show you sensible break points at the quote stage.
Do you offer fixed prices?
Yes. After a free home visit you get a detailed, itemised written quote — not a vague day rate.

Planning a project?

Free home visit, honest advice and a detailed written quote — within one working day.

Get a free quote →